翻訳と辞書
Words near each other
・ Richard B. Mellon
・ Richard B. Merrill
・ Richard B. Moore
・ Richard B. Morris
・ Richard B. Norgaard
・ Richard B. North
・ Richard B. Nowakowski
・ Richard B. Ogilvie
・ Richard B. Paddock
・ Richard B. Parkinson
・ Richard B. Pelzer
・ Richard B. Poore
・ Richard B. Rood
・ Richard B. Rothman
・ Richard B. Russell Airport
Richard B. Russell Dam
・ Richard B. Russell Federal Building
・ Richard B. Russell Lake
・ Richard B. Russell Library for Political Research and Studies
・ Richard B. Russell Multiple Resource Area
・ Richard B. Russell State Park
・ Richard B. Sanders
・ Richard B. Sellars
・ Richard B. Sewall
・ Richard B. Shapiro
・ Richard B. Shull
・ Richard B. Sibson
・ Richard B. Smith
・ Richard B. Smith (New York)
・ Richard B. Spencer


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Richard B. Russell Dam : ウィキペディア英語版
Richard B. Russell Dam

Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans and rises above the riverbed, housing a hydro-power plant with an installed capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and upstream from the J. Strom Thurmond Dam (1954).〔(USACE Richard B. Russell Dam Hydropower )〕
==History and construction==
The Flood Control Act of 1966 authorized construction of a new reservoir on the Savannah River to be named Trotters Shoals Lake and Dam. The lake and dam were renamed in 1987 after Georgia senator Richard Brevard Russell, Jr. in the same bill that also renamed Clarks Hill Lake to Lake Strom Thurmond. Construction on the new dam began in 1974 and filling of the lake began in October 1983. The lake reached full pool in December 1984 and the original power plant of four conventional turbine-generators went online in January 1985. In 1992, the addition of four 75 MW reversible pump-turbine units was completed, giving the dam a pumped-storage hydroelectricity capability.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Richard B. Russell Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.